Instruction Manual

Series 15M2
Water Hammer Arrestors
Sizes:
1
2" - 1" (15-25mm)
What is Water Hammer?
The noise from banging pipes is caused by shocks of high speed
water flowing in the piping system when a fixture is suddenly
closed. Sudden stoppage of the water (a non-compressible
liquid) flowing at a given pressure and velocity causes a surge or
spike of pressure and is called water hammer. When this occurs,
a pressure wave travels back through the piping until it finds a
point of relief.
Dishwashers, clothes washers, fast closing positive shutoff valves
incorporated in the system all contribute to creating water shock
which is not only annoying but damaging to pipes and appli-
ances. The Watts Series 15M2 incorporates a pre-charged,
permanent sealed air chamber to absorb the shock. The sealed
chamber prevents the loss of air to the water and insures long
and trouble-free life.
Features
NPT solid hex brass adapter or solder end connection
for easy installation
Approved for installation with no access panel required
May be installed in new or existing plumbing systems with a
standard pipe tee vertically, horizontally or at any angle
PDI Listed (PDI WH201)
Maintenance free piston is the only moving part
Air pre-load is 60psi (4.2 bar)
Factory air charged and permanently sealed
For Commercial Applications
ES-15M2
Pressure - Temperature
Operating Pressure: Designed to operate on all domestic and
commercial lines @ 150psi (10.6 bar) working pressure.
Temperature Range: 33°F to 180°F (0.5°C to 82°C).
Watts product specifications in U.S. customary units and metric are approximate and are provided for reference only. For precise measurements,
please contact Watts Technical Service. Watts reserves the right to change or modify product design, construction, specifications, or materials with-
out prior notice and without incurring any obligation to make such changes and modifications on Watts products previously or subsequently sold.
Standard: Listed by IAPMO, ASSE 1010 approved, ANSI
A112.26.1M approved, PDI WH201 approved and certified.
Standards
Materials
Job Name ___________________________________________ Contractor __________________________________________
Job Location _________________________________________ Approval ____________________________________________
Engineer _____________________________________________ Contractor’s P.O. No. _________________________________
Approval _____________________________________________ Representative ______________________________________
15M2
Body: Copper tubing
Piston: Polypropylene
Adapter: Brass
O-ring: EPDM

Summary of content (2 pages)