Specifications
WM_PRJ_Q2400_PTS_001 - 003
6th November 2002
confidential ©
Page : 
33 / 70
This document is the sole and exclusive property of WAVECOM. Not to be distributed or divulged 
without prior written agreement. 
Ce document est la propriété exclusive de WAVECOM. Il ne peut être communiqué ou divulgué à 
des tiers sans son autorisation préalable. 
Operating conditions 
Parameter I/O type Min Max Unit 
V
IL
 0 V 0.6 V V 
V
IH
 2.4 V VDD+0.5V V 
2.13.1 Operating  sequences 
2.13.1.1 Power ON 
Once the module supplied, the application must set the ON/OFF signal to high 
to start the module power ON sequence. The ON/OFF signal must be hold for 
500ms minimum. After this time, an internal mechanism keeps it on hold. 
During the power ON sequence, an internal reset is automatically performed by 
the module for 240ms (typical). During this phase, any external reset should be 
avoided. Once the initialisation is complete (timing is SIM and network 
dependent) the AT interface answers « OK » to the application
4
. For further 
details, please check the AT commands manual (+WIND, +WAIP) 
POWER SUPPL
Y
ON/OF
F
STATE OF THE MODUL
E
Module OFF 
I
BB+RF 
< 10µA 
AT answers « OK »
Module READY 
T
on/off-hold
(1000ms min) 
SIM and Network dependent 
RESET mode 
I
BB+RF
=20 to 40mA
INTERNAL RS
T
T
rst
(240ms typ) 
Module ON 
I
BB+RF
<120mA 
(no loc. update)
I
BB+RF 
= overall current consumption (Base Band + RF part) 
Figure 10 : Power-ON sequence (no PIN code activated) 
4
 For this, the application has to send AT↵. If the application manages hardware flow control, the 
AT command can be sent during the initialisation phase. Another solution is to use the +WIND 
command to get an unsolicited status from the module. 










