Specifications

User Manual 301/302
CONFIGURING The INSTRUMENT
Installation
Overview
This chapter contains information and instructions necessary to
prepare the Model 301/302 for operation. Details are provided for
initial inspection, grounding requirements, repackaging instructions for
storage or shipment, address selection and installation information.
Unpacking and
Initial Inspection
Unpacking and handling of the generator requires normal precautions
and procedures applicable to handling of sensitive electronic
equipment. The contents of all shipping containers should be checked
for included accessories and certified against the packing slip to
determine that the shipment is complete.
Safety
Precautions
The following safety precautions should be observed before using this
product and associated computer. Although some instruments and
accessories would normally be used with non-hazardous voltages,
there are situations where hazardous conditions may be present.
This product is intended for use by qualified persons who recognize
shock hazards and are familiar with the safety precautions required to
avoid possible injury. Read the operating information carefully before
using the product.
WARNING
For maximum safety, do not touch the product, test cables, or any
other instrument parts while power is applied to the circuit under
test. ALWAYS remove power from the entire test system before
connecting cables or jumpers, installing or removing cards from
the computer, or making internal changes such as changing the
GPIB address.
Do not touch any object that could provide a current path to the
common side of the circuit under test or power line (earth) ground.
Always keep your hands dry while handling the instrument.
Exercise extreme caution when a shock hazard is present. Lethal
voltage may be present on cables, connector jacks, or test fixtures.
The American National Standard Institute (ANSI) states that a shock
hazard exists when voltage levels greater than 30V RMS, 42.4V peak,
Configuring The Instrument
12