User Manual Part 1

8
Draft: 8/13 PTM 1000 Operations and Maintenance Manual
Lifting Guidelines
During installation, some lifting is required to set up the
equipment. Before installing the hardware, be certain that your
site is carefully located and prepared to accommodate power
sources and network connections.
Note
Once installed, the Hub and remote units are stationary. They
are not intended to be moved frequently.
Follow these guidelines when lifting:
1 Disconnect all external cables before lifting or moving the
chassis. Make sure the pathway is clear and free of equip-
ment and tools.
2 Do not attempt to lift the chassis alone. Two people are
required. Plan the move ahead of time, and make sure each
person has an escape path in case of an emergency.
3 Each person is required to grasp the chassis under the lower
edge and lift with both hands from the bottom. Ensure that
your footing is solid, and balance the weight of the object
between your feet evenly.
4 If you must bend down to lift the chassis, bend at the knees,
not at the waist. This reduces the strain on your back.
5 To prevent injury when you lift, keep your back straight and
lift with your legs, not your back. Lift the chassis slowly.
Never move suddenly or twist your body as you lift.
6 Place the chassis into a rack. Each person is required to
position the chassis by grasping the side with one hand and
the bottom with the other.
Note
We recommend that you lift the chassis with the power supply
removed. Use both hands to handle the chassis power supply.
Install the power supply on the rack before installing the
Hub IDU.