Owner's manual

2
INSTALLATION INSTRUCTIONS
STEP 1.Placetheunitoverthewheelwell,asclosetothewallaspossible.Markthetwooormountingholeswherethe
frontangecomesincontactwiththeoorrib.Removetheunitandpre-drilltheoormountinglocationswithan1/8"drillbit,
thenre-drilltheholewitha5/16"drillbit.Ifthereisaoormat,thenFloorMountingSpacersarerequired.Cuttheoormat
aroundthe5/16"holeswiththe1"holesaw,allowingFloorMountingSpacerstorestagainstthemetaloor. DO NOT DRILL
THROUGH THE VAN FLOOR WITH THE HOLE SAW.
STEP 2.Movetheunitbackintoposition.Fastenunittovanoorusingtwo(2)1/4-20x1-1/4"HexHeadBolts,1/4"Flat
Washers,FloorMountingSpacers(ifapplicable),secondsetof1/4"FlatWashersand1/4-20NylonLockNuts.(Seeexample
boltingsolutionsbelow).
NOTE: One(1)BlindFastenerandLockWasherhavebeenprovidedincasethrough-boltingisimpossibleduetoheatshields,
oorchannels,fuellines,etc.IfBlindFastenerinstallationisnecessary,redrillthe5/16"mountingholeswith13/32"drillbit.See
INSTALLATIONINSTRUCTIONSFORBLINDFASTENERSonpage4.
TOP DOWN INSTALLATION THROUGH
FLOOR MAT AND VAN FLOOR
BOTTOM UP INSTALLATION THROUGH
FLOOR MAT AND VAN FLOOR
BLIND FASTENER INSTALLATION
THROUGH FLOOR MAT AND VAN
FLOOR (SEE PAGE 4)
TOP DOWN INSTALLATION THROUGH
FLOOR MAT AND VAN FLOOR
BOTTOM UP INSTALLATION THROUGH
FLOOR MAT AND VAN FLOOR
BLIND FASTENER INSTALLATION
THROUGH FLOOR MAT AND VAN
FLOOR (SEE PAGE 4)