Owner's manual
2
INSTALLATION INSTRUCTIONS
STEP 1.Placetheunitoverthewheelwell,asclosetothewallaspossible.Markthetwooormountingholeswherethe
frontangecomesincontactwiththeoorrib.Removetheunitandpre-drilltheoormountinglocationswithan1/8"drillbit,
thenre-drilltheholewitha5/16"drillbit.Ifthereisaoormat,thenFloorMountingSpacersarerequired.Cuttheoormat
aroundthe5/16"holeswiththe1"holesaw,allowingFloorMountingSpacerstorestagainstthemetaloor. DO NOT DRILL
THROUGH THE VAN FLOOR WITH THE HOLE SAW.
STEP 2.Movetheunitbackintoposition.Fastenunittovanoorusingtwo(2)1/4-20x1-1/4"HexHeadBolts,1/4"Flat
Washers,FloorMountingSpacers(ifapplicable),secondsetof1/4"FlatWashersand1/4-20NylonLockNuts.(Seeexample
boltingsolutionsbelow).
NOTE: One(1)BlindFastenerandLockWasherhavebeenprovidedincasethrough-boltingisimpossibleduetoheatshields,
oorchannels,fuellines,etc.IfBlindFastenerinstallationisnecessary,redrillthe5/16"mountingholeswith13/32"drillbit.See
INSTALLATIONINSTRUCTIONSFORBLINDFASTENERSonpage4.
TOP DOWN INSTALLATION THROUGH
FLOOR MAT AND VAN FLOOR
BOTTOM UP INSTALLATION THROUGH
FLOOR MAT AND VAN FLOOR
BLIND FASTENER INSTALLATION
THROUGH FLOOR MAT AND VAN
FLOOR (SEE PAGE 4)
TOP DOWN INSTALLATION THROUGH
FLOOR MAT AND VAN FLOOR
BOTTOM UP INSTALLATION THROUGH
FLOOR MAT AND VAN FLOOR
BLIND FASTENER INSTALLATION
THROUGH FLOOR MAT AND VAN
FLOOR (SEE PAGE 4)










