Installation Guide
We’re happy to help. Call 1-888-743-3673.
Installation
4
2
B
A
1. Insert rail with aluminium (bottom rail) into
bottom route of post A and then into the
bottom route of post B.
1. Slide pickets through holes in bottom rail.
3
First post is already
concreted
Next post is in hole
with no concrete
B
A
1. Insert post A into hole and set concrete. Post B may be loosely laying in hole until panel is fully
installed. Repeat process down the line.
Fast2K Tip! Add one 12.4 oz. bag to the hole. Hold post in place to prevent movement and follow
mixing instructions on the bag. Pour around post and plumb during expansion.
2. To set posts in concrete, hold post in place and prevent movement to ensure the post stays straight.
Be prepared to use a minimum of (2) 60lb. bags of concrete for each post hole.
3. Mix concrete and pour wet.
4. Fill hole around and in concrete hole to ground level and plumb.
4
B
A