Picket Fence Installation Guide
Welcome A simple solution that adds style to your landscape. Thank you for choosing to add beauty and warmth to your landscape with our premium quality picket fence! Rest assured that our fencing will give you years of durable performance and maintenance-free satisfaction. The bottom rail is also reinforced with aluminum for added strength and durability. This guide will help make your installation easy. For questions, please call 1-888-743-3673 and welcome to Weatherables.
Product Specifications This fence can be trimmed down in width to accommodate custom applications Top View Flat Panel: 4.0 TAB Ground 4.0 96 3 Spacing* 7 3.5 1.75 49 35 0.120 wall thickness 3.5 84 1.75 x 3.5 x 95.75 1.75 2 0.120 wall thickness 33 Scalloped Panel: 96 3 Spacing* 13 3.
Installation Important Reminders: • We recommend installing 1 post and section at a time but other methods work too. Alter this method to suit your installation needs. • Prior to construction, check with your regulatory agency for special code requirements in your area. • Contact your utility supplier to locate and mark underground lines before excavation. • Sketch out the layout of your fence and calculate the number of panels, gates and posts required (to finish a fence run, one extra post kit is needed).
Installation A B 2 1. Insert post A into hole and set concrete. Post B may be loosely laying in hole until panel is fully installed. Repeat process down the line. Fast2K Tip! Add one 12.4 oz. bag to the hole. Hold post in place to prevent movement and follow mixing instructions on the bag. Pour around post and plumb during expansion. 2. To set posts in concrete, hold post in place and prevent movement to ensure the post stays straight. Be prepared to use a minimum of (2) 60lb.
Installation A B 1. Insert top rail into post A and place each pick into holes along the top rail. 5 Picket end withTABS are inserted first. A The larger routed holes should face toward the ground. Once inserted into bottom rail, pickets cannot be removed. 1. Insert top rail into the opposite post. B 2. Straighten and level next post. 3. Pour in mixed concrete. 4. Insert post hole covers into unused holes of first post. Repeat steps down the line. 6 5.