Installation Guide

Required Tools
• Level
• Plastic Shims (for leveling if necessary)
• Drill
Tapcon 3/16” x 2 3/4" Stainless Steel Screws Drill Bit for concrete pilot holes
• 1/4” Stainless Steel Washers
• 3/16” Tapcon Drill Bit for concrete pilot holes (typically is provided with screws)
• 1/8” Drill Bit for Pilot Holes)
• Clamps (with rubber pads)
• Carpenter’s Square
Tape Measure
NOTICE:
It is essential that you use the provided stainless steel screws to attach your
cabinetry together. Failure to use specied screws will render warranty null and void.
WEATHERSTRONG.COM
Installation
Guide
INSTALLATION TO EXTERIOR WALL:
If you are permanently fastening your cabinets to stucco, brick, or concrete block walls, Stainless Steel
Tapcon® fasteners are recommended (3/16" x 2¾"), sold separately. For base cabinets two fasteners are
recommended.
PRODUCT LIMITATIONS:
WeatherStrong can be installed indoors or out. Temperatures in excess of 140° F may result in warping. In
extremely warm climates consider airow if installing in direct sunlight. Only free-standing grills with
adequate space from direct heat are recommended.
SALT WATER ENVIRONMENTS:
Oceanfront environments with salt air and sea spray will require regular maintenance and cleaning to
prevent rust from forming on the handles, hinges and drawer runners. Clean stainless steel surfaces at least
two times a month to keep the chemical reaction from the salt from gaining a foothold on the hardware.
With regular cleaning, your cabinets will look like new for many years. To achieve maximum corrosion and
stain resistance, the surface of the stainless steel must be kept clean.
WS INSTALLATION INSTRUCTIONS

Summary of content (5 pages)