Installation Guide

21
3 4
(A)
45 in.
(114.3 cm)
to oor
45 in.
to oor
wall stud
Pin Installation Template to the “center point mark” (Point A).
CHARGER
MOUNTING
DRILL .234 DIA X 2.00 DEEP
INTO CENTERLINE OF STUD
APPROXIMATELY 17 INCHES
A
Detail of template
INSTALLATION STEPS
Measure and mark a point on the wall stud 45 inches
from the oor.
Use Stud Finder to locate wall stud.
Mark the center point of the wall stud.
Use Level to straighten Installation Template.
Tape Template in place.
Install a 6-50 receptacle according to the allowable locations
and orientation indicated on the Installation Template.