Technical data
Air Top 2000 ST Circuit diagrams
701
7 Circuit diagrams
7.1 General
The Air Top 2000 ST heater units can be operated with the
heater control (setpoint generator/switch) or a combination
timer.
The circuit diagrams (Fig. 702 to Fig. 705) show the possible
circuits for 12 or 24 Volt with
• Control element and vehicle blower
• Combination timer and vehicle blower
• ADR operation with control element
• Combination timer and electrical battery isolation
switch
Fig. 701 shows the plug assignment on the control unit.
Fig. 706 shows the schematic connection of the
combination timer.
See 7.2 for the legend of the wiring diagrams.
Fig. 701 Plug assignment
X1 = Combustion and hot air blower connection
X2 = Connection to glow plug
X3 = Overheating sensor connection
X4 = Metering pump connection
X5 = Flame monitor connection (only petrol heater)
X6 = Wiring harness connection
X1
X3
X2
X4
X5
X6