Installation Guide

114
03 04
06
Insert wedi Subliner Dry with
the printed side facing upward
and press on with a rubber rol-
ler or wooden float.
The sheets must overlap 2” at
joints / transitions. Apply a bed
of thinset mortar with the flat
side of the trowel onto the
lower mat joint connection
area and press flat.
01 02
Lay out wedi Subliner Dry and
cut to size using a knife or sci-
ssors.
Apply thinset mortar to the
prepared subfloor using a
1/8” ×
1/8” or 1/4” × 1/4” notch
trowel.
05
Press on the overlapping area
with a trowel or rubber roller.
Remove any escaping mortar
and air pockets. Cross joints
should be avoided.
Apply a continuous 1/2” bead
of wedi Joint Sealant along all
seams and spread flat with a
putty knife over the joints.
07
Start setting tile once the th-
inset mortar under Subliner Dry
has sufficiently cured.
Subliner Dry
Installation on Floors or other suitable,
non waterproof underlayments

Summary of content (1 pages)