Owner's Manual
1
.
B
efore beginning assembly, be sure that you
have read and understand the information in
the box above.
I
nsert four M8 x 63mm Carriage Bolts (1) up
through the Stabilizer (5). Insert two M8 x 63mm
Carriage Bolts up through the Base (4) (see the
inset drawing).
Attach the Base (4) to the Stabilizer (5) with two
M8 x 67mm Bolts (11), two M8 Washers (8), and
two M8 Nylon Locknuts (3).
Do not tighten the
Locknuts yet.
Slide the VKR Upright (74) and the Squat Upright
(56) onto the M8 x 63mm Carriage Bolts (1) in the
Stabilizer (5).
The high side of the brackets on
the VKR Upright and Squat Upright should be
on the side shown. Hand-tighten four M8 Nylon
Locknuts (3) onto the Carriage Bolts. Do not
tighten the Locknuts yet.
FRAME ASSEMBLY
6
2
2. Slide the Front Upright (42) onto the M8 x 63mm
Carriage Bolts (1) in the Base (4). Hand-tighten
two M8 Nylon Locknuts (3) onto the Carriage
Bolts. Do not tighten the Locknuts yet.
1
4
3
42
74
56
1
74
56
3
3
8
11
1
4
3
1
High
S
ide
5
1
4










