User manual

The devices associated with the current GSD le are now
listed in the device catalogue.
UpdatingGSDles
The naming convention for GSD les always follows this
pattern: GSD_V2.3-WI-UR20-20121214.xml. By reading off
the version (V2.3) and the date (14.12.2012), you can nd
out the status of a GSD le and determine whether you are
already using the latest version.
Download the latest GSD files from the Weidmüller web-
site.
9.3 CommissioningtheUR20-FBC-PN-IRT
Start SIMATIC Manager.
To set up a new project, click File/New.
The “New Project” window opens.
Enter a name for the new project (e.g. UR20_Station1)
and click OK.
The new project is displayed in SIMATIC Manager.
Creatinganewproject
Addingacontrolunittype
Select the project in SIMATIC Manager.
Select the control unit type VIA Add/Station
(e.g. SIMATIC 300).
Addingastation
Double-click on the project name so that the station
(SIMATIC 300) is displayed below in the directory tree.
Click on the station (SIMATIC 300).
Double-click Hardware on the right-hand side of the
window.
The “Hardware Conguration” window opens.
Hardwareconfiguration
The device catalogue is displayed on the right-hand side
of this window. If this does not occur, open the catalogue
via View/Catalogue.
Addingaprolerail:
In the catalogue, select the profile rail in use (e.g.
SIMATIC 300/RACK-300).
Commissioning| Commissioning the UR20-FBC-PN-IRT
254 1432790000/03/02.2014Manual u-remote