User Documentation

2053260000/05/201596
Planning
2.22 Important questions to ask when planning the network
infrastructure
What kind of cabling exists in the building / system?
What cabling/connection system is used?
How is the connection to the building network to be made?
Where is the machine connection point?
How great a distance is there from the building network?
What connection lengths are needed to the network participants?
Is redundant cabling needed?
Should the machine distributor be placed in the control cabinet or be a
standalone unit?
What kind of earthing concept is used?
What connection system should be used?
2.23 Tender specication sheets
Use the service provided by many network component manufacturers and
download your tender specication sheets – including some in GAEB (Joint
Committee on Information Technology in the Construction Industry) format.