User Documentation
2053260000/05/2015144
Installation
3.12 Checklist for installation
Requirements Notes
Were the dened
specications observed?
Is the cable type the planned
type?
Was the cable laid as
planned?
Were reserves provided
for commissioning and
extensions?
Was the minimum cable
spacing observed?
Were the plug-in connectors
used as planned?
Are the manufacturer's plug-in
connector test certicates
available?
Were all cables and
connections tested?
Were all test results
documented?
Do the transmission sections
have sufcient reserves for the
electrical parameters?
Are all connections marked?