User Documentation
Installation
2053260000/05/2015
121
4 Press upper module section onto bottom section.
If necessary, use pliers wrench to support plug. Fix
the braid with the second cable tie.
f) Testing
Test every cable that you route for:
• correct assignment
• end-to-end shield connection
• short-circuit
• split-pair errors
Further requirements of measurements on copper cabling are dened in the
PROFINET commissioning guideline. An extract can be found on the following
pages.