User Documentation

User Manual Managed Switches
64
Dual-Homing for a "Turbo Ring V2"
Master
Ring A Ring B
Primary Path
Backup Path
Master
3.5.3 Configuring “Turbo Ring (V1)” and “Turbo Ring V2”
Use the Communication Redundancy page to select “Turbo Ring (V1)”, Turbo Ring V2”, or
“Turbo Chain”. Note that configuration pages for these three protocols are different.
3.5.3.1 Configuring Turbo Ring (V1, original version)
1. Select Turbo Ring in field Redundancy protocol.
2. Activate checkbox ‘Set as Master for the switch which shall be assigned as ring master.
3. Select the Redundant ports’ which shall be used for the ring.
4. Optionally enable ‘Ring Coupling’ and select coupling ports if a ring coupling topology shall be
used.