Electromagnetic compatibility
These last two functional interferences result in stoppages
for entire production facilities and cause high breakdown
costs.
The following points must be taken into account in order to
achieve a system or plant that operates according to EMC
guidelines:
• Lightning protection
• Earthing
• Routing of cables
• Cable shielding
• Panel construction
• Sensors and actuators
• Transmitters and receivers
• Frequency converters
• Bus and eld devices
• ESD
W
The basics of lightning and surge protection