Ultra Boiler Manual

Part number 550-100-440/0122
17


BASIC INSTALLATION
 (continued)
Ultra Boilers must be vented and supplied
with combustion and ventilation air using
piping and methods described in this
manual
.
Every boiler must have its own vent. DO
NOT
common vent with any other appliance.
See page16.
Inspect nished vent and air piping thoroughly
to ensure all are airtight and comply with the
instructions provided and with all requirements
of applicable codes.
Failure to provide a properly-installed vent and
air system will cause severe personal injury or
death.
Venting/combustion air piping - Installations
must provide provisions for combustion and
ventilation air in accordance with the sec-
tion “Air for Combustion and Ventilation,” of
the National Fuel Gas Code - ANSI Z223.1/
NFPA54 – latest edition, or Sections 8.2, 8.3,
or 8.4 of Natural Gas and Propane Installation
Code - CAN/CSA B149.1, or applicable provi-
sions of the local building codes.
Use only the materials listed in this manual for
vent and air pipe and ttings. Failure to comply
could result in severe personal injury, death or
substantial property damage.
If used, a masonry chimney can ONLY be
used as a PIPE CHASE for vent and air pipes
— e vent and air piping must be installed as
instructed in this manual and all joints must be
sealed. e chimney must be used only for Ul-
tra boilers. NO OTHER appliance or replace
can be connected to the chimney.
e chimney must be straight, with no osets,
and the vent and air piping materials must
comply with this instruction manual.
e chimney must be tted with a sealed ac-
cess opening, through which the interior of the
chimney can be inspected.
e chimney and liner must be inspected at
least once annually to verify condition.
Failure to comply could result in severe personal
injury, death or substantial property damage.

1. Combustion air must be piped from outside to the boiler, fol-
lowing the instructions in this manual, and compliant with
all applicable codes. Read the warning in Figure11,page16,
and ensure the air intake will not be likely to draw in con-
taminated air.
2. Combustion air can be piped individually for each boiler, or
it can be manifolded as shown in Figure59,page59. Air pip-
ing must always terminate on the same side (or roof ) of the
building as the vent.

1. Boiler ue gases must be piped from the boiler to outside, fol-
lowing the instructions in this manual, and compliant with all
applicable codes. e vent pipe must terminate either through
the sidewall or through the roof, located with the correct
separation from the air termination. See Figure14,page20,
and the associated instructions referenced.
2. Each Ultra boiler requires a separate vent. Do not common
vent.

1. See Figure13,page19 for approved vent and air piping ma-
terials.