Ultra Boiler Manual
Part number 550-100-440/0122
27
BASIC INSTALLATION
Figure 26 Condensate trap assembly
Figure 27 Condensate trap assembly into jacket
Figure 28 Condensate drain — Ultra-80 & -105
1. Remove PVC ttings and gasket from the accessories bag.
2. Deburr and chamfer outside and inside of ½” x 1¼” PVC nipple
to ensure even cement distribution when joining.
3. Clean nipple ends and all ttings. Dry thoroughly.
4. For each joint in the condensate line, apply the following. Assemble
parts ONLY in the order given.
a. Apply primer liberally to both joint surfaces — pipe end and
tting socket.
b. While primer is still damp, lightly apply approved cement to
both surfaces in a uniform coating.
c. Apply a second coat of cement to both surfaces. Avoid using
too much cement on sockets to prevent cement buildup inside.
d. With cement still wet, insert pipe into tting, twisting ¼ turn.
Make sure pipe is fully inserted.
e. Wipe excess cement from joint. Check joint to be sure a smooth
bead of cement shows around the entire joint.
5. See Figure26.
6. Assemble the ½” PVC nipple to the PVC reducing elbow as shown.
7. Allow joint to dry completely.
8. en slide gasket over nipple as shown in Figure27.
9. Slide nipple through jacket condensate line hole to position as
shown in Figure27.
10. Cement the ½” tee to the protruding ½” nipple. Be sure both nipple
and reducing elbow nish upright.
Firmly press the reducing elbow and the tee together
while the cement sets to ensure the gasket is securely
compressed. e gasket ensures the jacket enclosure is
airtight at this location.
1. Remove condensate trap line from bag.
2. Ultra-80 & -105 only — Figure28
a. Guide the condensate trap line through the bracket hole as
shown.
b. Place a hose clamp over the end of the condensate line.
c. en slide the end of the trap line over the heat exchanger
condensate connection.
d. Tighten the hose clamp to secure the trap line.
e. Place a hose clamp over the other end of the condensate trap
line.
f. Slide the trap line over the reducing elbow and secure with
the hose clamp.
3. Ultra-155 and larger — Figure30,page28 or Figure31,page28
a. Slide a hose clamp over each end of the condensate trap line.
b. Slide the trap line onto the heat exchanger condensate connec-
tion and PVC reducing elbow as shown.
c. Tighten the hose clamps to secure the trap line.