Ultra Boiler Manual
MAINTENANCE &
SPECIFICATIONS
(Pages 108–140)
This section covers maintenance requirements for
all boilers, repair parts lists, boiler dimensions and
specications.
BASIC INSTALLATION
Quick view . . .
Pages
Procedure
4
Please read before proceeding
y Read safety information before proceeding
5–6
Prepare boiler location
y Clearances, oor and foundation
y Air openings to room for ventilation
7–8
Prepare boiler
y Make sure vent/air piping can be connected
y Remove from crate
y Convert for propane, if required
y Hydrostatic test
y Place boiler in position
9–15
Install water piping
y Install boiler trim and near boiler piping
y Complete system piping and connections
16
Appliances left on an existing vent system
y For appliances remaining on a vent system aer old
boiler is disconnected — verify that the vent system
works for remaining appliances
16-26
Vent/air piping
y Locate air intake piping to prevent contaminants from
entering boiler
y Install vent/air termination
y Install vent and air piping using acceptable materials
27–28
Install condensate piping
y Connect condensate hose
y Install condensate pump and lter, if required
29
Gas piping
y Verify gas pipe size
y Connect boiler to gas line
30-31
Field wiring
y Connect wiring to boiler and components
32–34
U-Control operation and setup
y U-Control operation and setup information
35–42
Start-up
y Clean system, then ll; add inhibitor
y Verify water chemistry
y Purge air from system
y Perform nal checks
y Start and operate boiler
y Perform nal verication tests
y Fill out Installation and Service Certicate
BASIC INSTALLATION
ADVANCED INSTALLATION
(Pages 44–107)
Read and follow the instructions in the BASIC
INSTALLATION section rst. Then use the ADVANCED
section for additional information.
This section covers multiple boiler systems and
additional system types not covered under the BASIC
section. It also includes alternative vent/air piping
methods, water and gas pipe sizing guidelines and
advanced, detailed information on the U-Control.
Part number 550-100-440/0122
3
BASIC INSTALLATION
(Pages 4–42)
This section covers basic installation and start-up
for most applications. It is limited to conventional
systems and to sidewall vent/air piping using the
Weil-McLain termination cap.
For applications not covered in this section, see the
ADVANCED INSTALLATION section.