Specifications

Part number 550-100-090/0809
65
g a s -f i r e d w a t e r b o i l e r Boiler Manual
ADVANCED INSTALLATION
Installing and supporting the concentric Figure 73
sidewall vent assembly
Ensure that the wall material is strong enough
to prevent the rain cap from being pushed
inward if struck or pushed from the outside.
Install terminations — concentric pipes
Assemble the vent termination as described for vertical concentric 1.
terminations, beginning on page 70.
If necessary, you can shorten the lengths of the inner and
outer pipes for a shorter finished assembly. But you must
ensure the pipes butt correctly at both ends. Failure to
properly assemble the concentric termination can result
in flue gas recirculation, causing possible severe personal
injury or death.
Wall penetration Preferably, use a thimble with a 4½-inch hole. 2.
If not using a thimble, carefully use a hole saw to cut a hole not
larger than 4¾ inches in diameter through the wall. The finished
hole must provide a solid stop for the rain cap ribs, as shown in
the inset to Figure 73.
Secure the termination in place so the rain cap will butt against the 3.
outside wall or outer thimble plate as shown in Figure 73.
Before beginning vent and air piping from the boiler to the con-4.
centric termination, mount and secure the concentric termination
as shown in Figure 73.
The vent and air piping must be securely supported, and
must not rest its weight on the boiler fittings. Failure to
properly support the vent and air piping could result in
vent piping damage, resulting in possible severe personal
injury, death or substantial property damage.
The supports/bracing used must support the termination
assembly to prevent vslippage or movement.
The clamps used on the outside of the termination pipe
must not cut into the pipe or contain sharp edges that
could cause a crack to form.
When inserting the partially-assembled termination
kit through the roof penetration, wrap plastic or other
protection over the end of the exposed assembly to pre-
vent debris from entering the pipes. If the air passages
become blocked, the boiler will not operate. Once the
rain cap has been cemented to the assembly, there is no
way to correct the problem. The assembly would have
to be replaced if it were cut to be removed and cleaned.
Altering the assembly in any way could result in severe
personal injury or death due to toxic flue product emis-
sions.
When using AL294C stainless vent pipe, use the vent pipe
manufacturer’s 3-inch PVC adapter when connecting to
the concentric vent attachment.
After the assembly has been positioned in the opening and all 5.
supports have been attached, install the bird screen and rain cap
as follows:
Place the bird screen on the end of the inner pipe as in a. Fig-
ure 84, page 71.
Cement the rain cap in place as shown.b.
Sidewall vent/air termination: 3” PVC concentric (cont.)