Installation guide

Wellav Technologies Ltd.
11
UMH 160 Quick Installation Guide
V1.1-W
z Protective Ground - The protective ground lead of the building's electrical
installation should comply with national and local requirements.
z Environmental Condition - The installation site should be dry, clean, and
ventilated. Do not use this equipment where it could be at risk of contact with water.
To avoid electric shock, make sure the rack has been correctly grounded
before switching device on the.
To mount the receiver unit to a 19”/42U rack, please perform the following steps:
1. Make sure the mounted rack surface is stable and can support the size and weight of this
equipment.
2. For single unit mounting, use an “L” shape slide (not included in the package) to support
holding the unit if necessary, and fastened with appropriate screws to each side of the
chassis’ rails.
L-shape slide
3. For group pile up (no space between each unit), the unit should be placed on a flat
holding bracket. No more than 5 units for each group, and leave at least one unit space
between each group to ensure good air ventilation.
PIC-5.1-1 Grounding Jackscrew ( must be connected to the rack housing)