User Manual
9
3. Tighten two M8 x 20mm Screws (2) with two M8
Washers (5) and a M10 x 42mm Screw (1) into
the Base (35) and into the Right Upright (56) as
shown; do not fully tighten the Screws yet.
Repeat this step on the left side of the tread-
mill. Then, tighten all four Screws (1, 2, 6) on
each side.
5
2
1
6
35
56
4. Pivot the Handrails (52) down to the horizontal
position.
4
52
52
3
5. Tighten an M8 x 15mm Screw (3) with an M8
Washer (5) into the bottom of each Handrail (52)
as shown; firmly tighten the Screws.
5
5
52
3
52
5
3