Installation Guide

NOTE: Copper lines are color coded with red or blue tape
and are refered to as Red line and Blue line.
Step
2 - Mount to Sink
Straighten copper lines being careful not to kink.
Remove
mounting nut, washer and support plate from
th
readed mounting tube.
Insert
lines through 1 1/16” to 1 3/8” hole in sink or counter.
From underneath sink, slide support plate, washer and
mounting nut over flexible rubber tube and threaded
mounting tube.
Tighten
the mounting nut to secure.
Do
not over-tighten.
Step 3 - Connect to Hot Water Dispenser
Refer to tank installation instructions and illustration above to
connect the Red line from the faucet to the rear corner inlet
tube on top of the tank.
Step 4 - Connecting to Cold Water Supply
Connect Blue line to cold water supply. Refer to tank
instructions for connecting to water supply line.
Return to tank installation instructions to complete
plumbing connections and installation.
WARRANTY: Quick&Hot Faucets are warranted for 1 year
from the date of purchase.
Go to www.westbrass.com or
call (800) 39-BRASS for further details.
FAUCET INSTALLATION - Calorah or Velosah (D261/D271) SERIES
Hose connector -
provided with this
faucet.
center outlet
tank
Tighten compression nut
to
clamp fitting to tank
outlet
tube.
Do
not overtighten.
Faucet connection to center outlet of hot water tank
Clamp
White or
Clear Line
WARNING!
Direct faucet spout away from handles to avoid
serious burn.
דײסב
2429 E Olympic Blvd. Los Angeles, CA 90021

Summary of content (2 pages)