Installation manual

SERVICE
SCHEDULE
CYLINDER
HEAD
BOLT
TORQUING
Tighten the cylinder head bolts
to
the specified torque before making valve adjustments.
When
No.1
cylinder
IS
at top dead
enler
J.
1 I i
TINC!.'EX
liN
fEX
When
No.1
cylinder
is
at top
dead
center
1
'~31IN
J T
\1
EX
i
(fiN
(rEX
When NoA cylinder IS a t top
dead
center
63(BXC)FOUR,
71(B)(C)FOUR
& 82BFOUR
Valve Clearance: Intake & Exhaust 0.012 inch (0.30
rom)
Procedure
to
adjust
(l~EX
108(BXC)
SIX
1.
Position the piston
#1
cylinder approximately
IDC
(Top Dead Center)
of
its compression stroke. Adjust the
valve clearance
on
the values for the cylinders specified.
4 Cylinder Model
Intake valves - No. 1 and
No.2
cylinders
Exhaust valves
-
No.1
and
No.3
cylinders
6 Cylinder Model
Intake valves -
No.1,
2 and 4 cylinders
Exhaust valves
-
No.1,
3 and 5 cylinders
2.
Tum
the crankshaft 360
0
(one complete
revolution) and adjust the valve clearances
on the valves for the cylinders specified.
4 Cylinder Model
Intake valves - NO.3 and NO.4 cylinders
Exhaust valves
- NO.2 and
No.4
cylinders
6 Cylinder Model
Intake valves -
No.3,
5 and 6 cylinders
Exhaust valves
-
No.2,
4 and 6 cylinders
Engines & Generators
42