Installation manual
OPERATING
INSTRUCTIONS
REMOTE
PANEL
Starting
the
Generator
To
start the generator, hold the momentary
ON
switch
in
the
up
(on) position (the green light will
come
on), then hold the
momentary
START/STOP switch in the up (start) position
(both switches are held up together). After approximately onc
second.
the
starter
will engage
and
the
engine will
crank
{the
green
light
will
dim).
Once
the
en'gine
is
running
(the
green
light
will brighten»,
the
starter
will disengage,
and
the
START/STOP switch
may
then be released to return to its
center
(run mode) position. Continue holding the
ON
switch
until
the
engine
has
sufficient oil
pressure,
then 'release
it
to
its
center
position.
NOTE:
Should the engine fail to start, release both switches,
wait
20
seconds, and
try
again. Never
run
the starter more
than 20 seconds at a time.
_<>
START
--
/
--
/
/
I]~'v::/==::::O
OFF/RUN
__
<,-'
START
............
;~/"
STOP
OFF
START
ISTOP
SWITCI/
ON
SWITCH
Stopping
the
Generator
To stop the generator, move the momentary START/STOP
switch
to
the
down
(stop)
position
then
release
it
to
the
center
(off/run mode) position. This will de-energize the K2 run
relay
in
the
generator's
control
panel
and
stop
the
generator.
WESTERBEKE
Engines & Generators
9
REMOTE
PANEL