Product Manual

4.3 MACHINE BREAK-IN
Although there are no operational restrictions on
the TransCube when used for the first time, it is
recommended that the following mechanical items
be checked:
A. After Using for 1 and 5 Hours:
1. Check all nuts, bolts and other fasteners.
Tighten to their specified torque level.
2. Check that the fuel lines and connections
are in good condition and there are no
leaks.
3. Check that the electrical system is in good
condition. Be sure all terminals and con-
nectors are clean and fully engaged.
4. Then go to the regular service schedule
as defined in Section 5.
4.4 PRE-OPERATION CHECKLIST
Efficient and safe operation of the TransCube re-
quires that each operator reads and understands
the using procedures and all related safety pre-
cautions outlined in this section. A pre-operation
checklist is provided for the operator. It is impor-
tant for both the personal safety and maintaining
the good mechanical condition of the TransCube
that this checklist is followed.
Before using the TransCube and each time there-
after, the following areas should be checked off:
1. Check that the TransCube is bolted or an-
chored to the transporting vehicle.
2. Disconnect and secure all the lines and hoses
before transporting.
3. Close and tighten filler cap when tank is full.
4. Turn pump off and disconnect or remove
power lines.
5. Check the interstice area (bund). Clean if
there is any debris, trash or diesel fuel.
6. Check that all the required documentation and
placards are with the unit and in good condi-
tion.
12