Product Manual

26
17. Monitoring:
The best results are obtained when the Tran-
sCube is monitored, inspected, checked and
tested per this recommended list. Keep and
maintain these records.
a. During Fuel Transfers:
Someone needs to be in attendance
when filling the TransCube or transferring
fuel. Always manually hold the nozzle
and depress the trigger when transferring
into or out of the TransCube. Visually
monitor the fuel gauge while transfer-
ring fuel to prevent spilling or overfilling.
Remember the maximum legal capacity is
95% full. Do not direct connect.
b. Daily Checklist (While In Use):
It is recommended that the tank and all
of its components be maintained in good
condition at all times. Develop a check-
list to use when verifying the condition
of each component or system. It should
include but not be limited to:
Fuel level.
Pipes, tubes, valves and couplers.
Hoses, nozzles and connections.
Leaks.
Bent, broken or damaged compo-
nents.
Electrical wires, terminals and con-
nections.
Stop leaks, repair problems and replace
any broken components with genuine
replacement parts or their equivalent.
Fig. 20 POWER CORD
16. Power Source:
When a pump is fit-
ted, the unit comes
from the factory with
a power cord to the
pump. It is recom-
mended that 20 amp
rated battery clamps
on the power cord to
attach to battery termi-
nals on the equipment
being refueled (12 volt
pump only).