Product Manual B

WM006 FCP250-500-1000-EN Revision 1 - Sep 2019
22
TRANSPORTING
NOTE: TRANSPORT EMPTY ONLY
In transport ALL ports, valves and vents must be closed
Ensure pump is turned off
Close and lock the access lid
The FCP must be secured firmly to its means of transport
The FCP is designed with the structural strength to allow stacking
2 high when empty.
Always mate the corner brackets together to stabilise the stack.
Use only a hoist or forklift with the required lift capacity to raise,
lower or stack the tanks.