Positioning
Where the FCP is to be permanently positioned for use (long or short term) it is
important that certain aspects are considered
You should make sure that both supplying vehicle and receiving vehicle have
safe and easy access to the FCP
The position should be selected where the unit will be protected from
accidental impact
Consideration should be given to the location of overhead services such as
telecommunications, power cables and overhanging obstructions. Be aware
of the location of underground services, such as drains, and manhole covers
You must also consider the ground surface and make sure it can support the
weight of the FCP, its contents when full and any stored equipment such as
pumps, without the risk of subsidence. It should be positioned on smooth
and level ground with access available to the rear and sides
Allow for access that may be required by the emergency services should it
become necessary
FILLING THE FCP
DO NOT FILL TANK WHEN DISPENSING IS IN OPERATION
Only fill the FCP to 95% of its nominal capacity See UNIT SPECIFICATION
Filling should only be performed by a suitably trained person and only
following a full risk assessment
The FCP must be positioned on a firm level surface.
Before filling, ensure that you have a suitable spill containment kit and that
you are wearing all required PPE
Nozzle Fill - Unlock and open the access lid. Unscrew and remove the 3” filler
cap, place the filling nozzle in the 3” port
Do not leave the nozzle unattended during the filling process
Observe the fuel level for an indication of tank capacity, then once filled,
replace the filler cap and clean up any spills