Specifications

Alto 818 Installation and Operation
5-2 P/N 66109074001 Rev. D
5.1 UNPACKING
1. Inspect new equipment before beginning a bench test; report any damage to the carrier and
to WSE.
2. Retain the container and protective packing material for use in transporting equipment to the
installation site or for return to factory, if required.
3. If a malfunction occurs during the bench check, do not attempt to troubleshoot or repair the
equipment; notify WSE immediately.