Specifications

Alto 818 Installation and Operation
5-12 P/N 66109074001 Rev. D
5.3.7 BENCH CHECK CONCLUSION
To conclude the bench check, proceed as follows:
1. If still in the command mode, type BYE (B); and press Enter.
2. Turn the ACU power module off. Turn off the power module used for the RS-485 S-Net
devices.
3. Disconnect all cables and wiring from the Alto 818.
4. If you do not plan immediate installation of the ACU, remove the cover from the Alto 818 and
ensure that S2 (Figure 5-3) is off. Replace the cover of the Alto 818.
5. Repack the Alto 818 in the original shipping container using the same packing method and
materials used by the factory.