Specifications

IMPORTANT: If the valve monitor is already in the field mounted on an actuator
and valve, please follow the field wiring instructions in Section 2.4.
Confirm that the area is known to be non-hazardous before opening the
cover of a network monitor and making or breaking any electrical connections.
2.1 Mounting
For steps 1-3 refer to Figure 2 below.
1. Attach the proper mounting bracket and adapter (if required) to the valve monitor
housing with the hardware provided.
2. Operate the actuator to full closed position.
3. Attach the valve monitor and mounting bracket to the actuator.
4. Note the position of the actuator/valve and confirm the Beacon position is
properly aligned, as shown in Figure 3 below while replacing the cover.
Figure 2
Tech-309
2-2