User Manual

Premier Guard Installation Manual
9
Quick Start for System Connections
A Premier Guard system consists of a stepdown transformer, a Premier Line Control Unit
(PLCU) and a transceiver (antenna).
The transformer box has two 24vac outputs that can power both the PLCU and transceiver. A
single transformer box supports one PLCU and transceiver.
The PLCU is powered by the stepdown transformer via a single 24vac power input. The
PLCU has two types of connections for the transceiver. One is a transmit control signal
connector and the other s a receive signal connector. Both the TX and RX cables will connect
from the PLCU to the transceiver. The PLCU case is constructed to facilitate wall mounting.
Before permanently connecting the pedestal, place it at the location you intend to install it,
and then arrange the cables from the PLCU directly to the pedestal. You will have to remove
the pedestal base cover to connect the cables.
Additional installation procedures are shown in greater detail in the following sections.
Connections Legend
Power Bus
TX Control Signal
RX Signal
Premier Guard
Transceiver Antenna
24vac
24vac
Transforme
r
PLCU
110/220vac
24vac