User guide

WHEATHEART - INTAKE HOPPER 3. OPERATION, TRANSPORT, & MAINTENANCE
BH/GHR AUGERS 3.1. OPERATING PROCEDURE
30735 R1 13
3.Operation, Transport, &
Maintenance
3.1. OPERATING PROCEDURE
Figure 3.1
1. For other auger-related placement instructions, please refer to your auger
operation manual.
2. Remove tow bar from hopper. Place auger/hopper in desired location (for
example, under a bin hopper). See Placement instructions in auger operator
manual.
3. Set the hopper to self-level by disconnecting transport channel at top end.
4. To clean out after use, remove the cleanout cover by removing the four 5/16”
nuts holding it in place and use a vacuum or other tool to clean out.