User guide

3. OPERATION, TRANSPORT, & MAINTENANCE WHEATHEART - INTAKE HOPPER
3.3. MAINTENANCE PROCEDURES BH/GHR AUGERS
16 30735 R1
Figure 3.4
IF MOVING AUGER BETWEEN BINS:
1. Ensure auger is empty and lower auger until stabilizer bar can be secured in
one of the holes with saddle pin and snap pin. Slowly move to only to an
adjacent bin. Or alternatively, if it is not possible to lower the auger, lift the
hopper and have a second person align and secure the stabilizer bar.
2. If required, re-attach tow bar to auger and move with tractor. Refer to Figure
3.2.
3. Remove tow bar and position auger in desired location.
4. Disconnect stabilizer bar at top end and place saddle pin back through hole
and secure with hairpin.
3.3. MAINTENANCE PROCEDURES
1. Frequently, or every eight hours of operation, open service door and grease
bushing the u-joint. Close door.