Manual

4. TRANSPORT & PLACEMENT WHEATHEART - SELF-PROPELLED AUGER KIT
4.2. PLACEMENT PROCEDURE WHEATHEART BH & R SERIES
34 30761 R0
4.2. PLACEMENT PROCEDURE
Follow this procedure when placing the machine into its working position:
1. Be sure there is enough clearance from overhead obstructions, power lines,
or other equipment to move the machine into its working position.
2. Position machine in the desired area. For operating instructions, see Section
5.2.
WHEN PLACING UNDER HOPPER BOTTOM BINS:
1. Ensure the wheel v-frame can easily pass through the hopper bin vertical
legs.
2. Ensure the wheel v-frame does not have to travel over an obstruction.
3. Auger intake is centered between the hopper bin vertical legs. This ensures
that the operator has adequate clearance for auger operation.
4. Ensure the auger gearbox will not contact the hopper cone when in it’s final
position.
WHEN PLACING INTO FLAT BOTTOM BINS:
1. Ensure the wheel v-frame won’t contact the side of the bin when auger is in
its final position.
2. Ensure the door of the bin is not obstructed.
3. Ensure the auger intake will fit through the bin access door.