Manual

Installing cabinet into wood frame
1. Remove top channel and both side channels using a 1/4"nut
driver or socket wrench, Discard top channel and both side
channels.
2=
A. Remove these screws
Insert cabinet into the framed wall opening, The top of the
cabinet should extend %" (19.1 mm) into the room, If there is
trim, the cabinet should extend 3/4"(19.1 mm) past the trim.
A
B
A. _ (19.1 mm) extending into room
B. Trim
3. Use a level to check that cabinet is level side to side.
4. Check that air conditioner cabinet is tilted to the outside so
that water will run to the outside.
5. Reuse the insulation to seal opening between cabinet and
frame.
6=
Use existing holes in sides and top of cabinet and 7 - #10 x
1" wood screws (not provided) to attach cabinet to frame.
NOTE: Do not overtighten screws or cabinet will distort and
provide a poor air seal between cabinet and air conditioner.
7. Caulk all outside wall openings around cabinet.
Peel paper from adhesive backing on the 21/2'' (6.4 cm) seal
strip, Place the 21/2'' (6,4 cm) seal strip inside the cabinet,
Make seal flush with cabinet front edge.
NOTE: This seal strip fits between the air conditioner base
and the cabinet.
I
A. 2½" sealstrip
NOTE: Handle air conditioner with care.
2. Peel paper from adhesive backing on one of the 2 short air
conditioner seals. Align left-side air conditioner seal against
metal flange behind control box. Attach long, top air
conditioner seal over seam in top of air condtioner and right-
side air conditioner seal so they align with left seal.
B
A. Long, top air conditioner seal
B. Short left-side air conditioner seal
10