Manual

NOTE:Thisscrewisrequiredtocorrectlyattachcurtain(top
tobottom)totheairconditionercabinet.
1. Centerairconditionerinwindow.Checkthatfeetonbottom
ofairconditionerarebehindandagainstbacksideofwindow
sill.Lowerwindowsashtoholdcabinetinplace.
1. #8 x _ in. pan-head screw
7. While the right-hand curtain is still extended, insert screws
into top and bottom slots of curtain. Using #8 x % in. pan-
head screws, screw curtain to the top and bottom holes in air
conditioner cabinet.
8. Slide curtain housing into guides as far as it will go.
9. Repeat above steps for left-hand curtain.
Handle air conditioner with care.
Be sure your air conditioner does not fall out of the opening
during installation or removal.
The place where the power cord exits the air conditioner
should be no more than 4 ft (122 cm) from a grounded outlet.
Do not block the louvers on the front panel.
Do not block the louvers on the outside of the air conditioner.
Excessive Weight Hazard
Use two or more people to move and install
air conditioner.
Failure to do so can result in back or other injury.
1. Window sash
2. Feet on bottom of air conditioner
behind back side of window sill
2. Pull left-hand curtain frame out until it fits into the window
channel. Repeat with right-hand curtain frame.
Attach side curtains to window
1. Insert one of the #8 x s/4in. round-head screws through left-
hand curtain frame and into the window channel to fasten the
curtain frame to the window.
2. Repeat for right-hand curtain frame.
Front view
Top view
1. Hole for #8 x _ in. round-head screw
2. Side curtain
2 ....................
!. Side curtain against window channel
2. Window channel
3. #8 x _in. round-head screw