Instruction for Use

EN9
INSTALLATION  ASSEMBLY INSTRUCTIONS
The instructions below, to be carried out in the order in which they are numbered, refer to the gures (with the same step
numbers) given on the last pages of this manual.
1. Position the wall unit shelf at a height of 14 cm from the bottom.
2-3-4. Position the drilling template on the bottom of the shelf, drill the 4 Ø 5mm side holes and prepare the central
opening for the air vent.
5. Fit the check valve for fumes to the hood’s fumes outlet.
6. Feed through the power supply cable and secure the cable clamp (using n.1 screw 3.5x9.5).
7. For the upper outlet: drill the top of the wall unit, taking into account the position of the outlet hole.
8. For rear outlet: drill the back of the wall unit at the desired height.
9. Secure the hood to the wall unit using the 4 screws 4.2x35.
10. Open the steam deector and remove the metal grease lters.
11. Adjust the slideout stroke of the deector by installing the two brackets provided; x them using the 2 screws
3.5x9.5.
12-13. Fit ducting for the venting of fumes, connecting it to the connector ring (for the Filter version, a small section of
ducting that reaches the top of the wall unit will suce)
NB: the ducting is not included in the pack and must be purchased separately.
12. For lter version only: t the carbon lter (refer to instructions in the section MAINTENANCE-Carbon Filter).
13. Ret the metal grease lters.