Specifications

4-29
10. Remove the bellows from the tub (see
pages 4-14 through 4-16 for the proce-
d
ure).
11. Using a shallow pan to catch the water,
unscrew the filter from the drain pump,
and drain the water from the pump.
Drain Pump Filter
12. Loosen the clamp and remove the pump-
to-tub hose from the drain pump.
REASSEMBL
Y NOTE: When you reconnect
the hose, align the tab with the arrow on the
drain pump.
Pump-To-Tub Hose
Tab
Arrow
13. Remove the rear panel (see page 4-20
for the procedure).
14. Loosen the clamp and remove the vent
tube-to-tub end.
Vent Tube-To-Tub
17. Disconnect the pressure hose from the
pressure switch.
Pressure Hose
Pressure Switch
15. Remove the basket drive pulley from the
basket shaft (see page 4-27 for the pro-
cedure).
16.
Remove the T-20 Torx screw from the
ground wire that is connected to the bear-
ing
hub, and pull the wire out of the tub
holes.
Ground Wire Screw
Bearing Hub
Continued on the next page.