Installation guide

[] []urn
Three°wke power suppBy cord must be
four feet long and have three, NoM 0
copper wires and match a three°wire
receptacle of NEMA Type ] 0=30R
iiiiiiiiii_
Direct wire power supply came must be
prepared as shown in "Preparing the wire"
of the three-wire connection direct-wire
stepsabove.
WhereMe€aMcodesDoNetpermit
connecting cabinet=groundconductor to neutral wire:
4. Remove center terminal block screw.
6. Connect the other
wires to outer terminal
block screws. Tighten
screws.
7. Tighten strain
relief screws.
8. Insert tab of terminal block
cover into slot of dryer rear
panel Secure cover with
hold-down screw.
9, Connect a separate copper ground wire
from the external ground connector screw to
an adequate ground.
5. Remove the appliance
ground wire (green with yellow
stripes) from the external
ground connector screw.
Connect appliance ground wire
and the neutral wire (white or
center) of the power supply
cord/cabIe under the center,
silverocoiored terminal block
screw. Tighten screw.
Dryer must be level to reduce noise and assure
proper performance.
Slide dryer onto cardboard or hardboard before
moving across floor to prevent floor damage.
l Move dryer close to its permanent location.
Leave enough room to connect exhaust vent. Remove
cardboard or hardboard from under dryer.
Check levelness of dryer by placing a level on
top of dryer, first side to side, then front to back. If
dryer is not level, adjust dryer legs up or down.
If legs are not long enough to level dryer, order
Extended Dryer Feet Kit, Part No. 27981 0 (sold two
legs per kit), from your dealer.
4" damp
Using a 4' clamp,
connect exhaust vent to
exhaust outlet in dryer. If connecting
to existing exhaust vent, make sure
the vent is clean.
The dryer exhaust vent must fit over the dryer
exhaust outlet and inside the exhaust hood.
Make sure exhaust vent is secured to exhaust hood
with a 4" clamp.
Move dryer into final position. Do not crush
or kink exhaust vent. Make sure dryer is level.
l Check that you:
_/did not skip any steps.
_/ installed all parts.
_" properly installed dryer legs.
_/leveled dryer.
_" have secured all exhaust vent joints with 4" clamps.
_" have all the tools you started with.
Plug power supply cord into grounded outlet
or connect direct wire to power supply. Turn power
supply on.
Read the Use and Care Guide to fully
understand your new dryer. Select a fuji heat cycle
(not the air cycle) and start dryen After five minutes,
open dryer door. You shouid feel heat inside dryer.
If dryer does not operate properly, check the
following:
_" electrical supply is connected.
_" house fuse is intact and tight; or circuit breaker
has not tripped.
_" dryer door is closed.
_/controls are set in a running or "On" position.
_/ start button has been pushed firmly.
If dryer makes an unusual noise, check that the dryer
[s level
Panel E
÷T0tal kit length
8 feet
"As easy as t =2=3"
Step 1
Clamp one
elbow/vent
section to wall
and one to
dryer,
Step 2
Extend vent
upward, almost
to top of dryer,
then I_ush dryer
to wall.
Step 3
From over the
top, snap vent
together.
Dura Safe _nd Sure Connect are T,,ade n_rks of Whirlpool, USA,
Provides 2 1/2" cleararme
betweea @yet aad wall
Great for closet
iastalJa_iaas
8"=18", 18"-29" or
29"=50" periscopes
irmJude eae male
saap=Jeakfitting,
oae extra [aag
draw=baad cellar
aad eae aJamp
0"-18": Part#43gG037
18".2g": Part#4396011
2g"-_O": Part#4396014
18"-2g" and 29':50" Periscope
18"=29": Part#4396811 2g"-58": Part #43gG_14
F@t m@te i_f@tma_i@_
te easily place ye t
ether, call
1-800-442-9991
Te have ye r ve ti g
professionally i s alled,
1-800-253-1301
for the eatest
a theti=e service