Owner's Manual
Table Of Contents
- DRYER SAFETY
- Dryer Safety
- DRYER MAINTENANCE AND CARE
- Cleaning the Dryer Location
- Cleaning the Dryer Interior
- Removing Accumulated Lint
- Cleaning the Lint Screen
- Check Your Vent System for Good Airflow
- Maintain Good Airflow
- Nonuse, Storage, and Moving Care
- INSTALLATION INSTRUCTIONS
- REQUIREMENTS
- Tools and Parts
- Location Requirements
- Electrical Requirements
- Electrical Requirements – U.S.A.
- Electric Requirements – Canada
- INSTALLATION
- Install Leveling Legs
- Electrical Installation – U.S.A.
- Home Venting Requirements
- Plan Vent System
- Install Vent System
- Connect Vent (Vented Models Only)
- Level Dryer
- Complete Installation Checklist
- SECURITE DE LA SECHEUSE
- Sécurité de la sécheuse
- ENTRETIEN ET REPARATION DE LA SECHEUSE
- Nettoyage de l’emplacement de la sécheuse
- Nettoyage de l’intérieur de la sécheuse
- Retrait de la charpie accumulée
- Nettoyage du filtre à charpie
- Vérification d’une circulation d’air adéquate pour le système d’évacuation
- Pour maintenir une bonne circulation d’air
- Précautions à prendre lorsque l’appareil n’est pas utilisé, est entreposé ou déménagé
- INSTRUCTIONS D'INSTALLATION
- SPECIFICATIONS
- Outils et pièces
- Exigences d’emplacement
- Spécifications électriques
- Spécifications électriques – É.-U.
- Spécifications électriques – Canada
- INSTALLATION
- Installation des pieds de nivellement
- Installation électrique – É.-U.
- Exigences concernant l’évacuation pour une maison
- Planification des circuits de conduits
- Installation du conduit d’évacuation
- Raccordement du conduit d’évacuation (sur les modèles avec conduit seulement)
- Réglage de l’aplomb de la sécheuse
- Liste de vérification pour installation terminée
- Blank Page
- Blank Page
- Blank Page
- Blank Page
14
Optional 3-Wire Connection (Power Supply Cord
Shown)
IMPORTANT: You must verify with a qualified electrician that this
grounding method is acceptable before connecting.
1. Prepare to connect neutral bond wire and
neutral wire
Install the correct strain relief for your electrical connection
method. Remove center terminal block screw (B). Remove
neutral bond wire (E) from green external ground conductor
screw (A).
2. Connect neutral bond wire and neutral wire
Connect neutral bond wire (E) and neutral wire (white or
center wire) (C) of power supply cord or cable under center
terminal block screw (B). Tighten screw.
3. Connect remaining wires
Place remaining wires under outer terminal block screws.
Tighten screws.
4. Connect external ground wire
Connect a separate copper ground wire (G) from the green
external ground conductor screw (A) to an adequate ground.
Insert tab of terminal block cover into slot of dryer rear panel.
Secure cover with hold-down screw. Now, go to “Venting
Requirements.”
Venting Requirements
WARNING
Fire Hazard
Use a heavy metal vent.
Do not use a plastic vent.
Do not use a metal foil vent.
Failure to follow these instructions can result in death or
fire.
WARNING: To reduce the risk of fire, this dryer MUST BE
EXHAUSTED OUTDOORS.
IMPORTANT: Observe all governing codes and ordinances. Dryer
exhaust must not be connected into any gas vent, chimney, wall,
ceiling, attic, crawlspace, or a concealed space of a building. Only
rigid or flexible metal vent shall be used for exhausting.
� Only a 4" (102 mm) heavy metal exhaust vent and clamps may
be used.
� Do not use plastic or metal foil vent.
Rigid metal vent:
� Recommended for best drying performance and to avoid
crushing and kinking.
Flexible metal vent (acceptable only if accessible to clean):
� Must be fully extended and supported in final dryer location.
� Remove excess to avoid sagging and kinking that may result
in reduced airflow and poor performance.
� Do not install in enclosed walls, ceilings, or floors.
� The total length should not exceed 7
3
/
4
ft (2.4 m).
� The length of flexible metal vent used must be included in the
overall vent system design as shown in the “Vent System
Chart.”