Manual

INSTALLATIONINSTRUCTIONS
Determine which venting method is best for your application. Island Location - Vent System Installed Under a Concrete
Vent system can terminate either through the wall or floor. Slab Using PVC Sewer Pipe
Island Location
Front (Standard)-Mounted
Blower Motor
Rear-Mounted Blower
Motor
Front (Standard) Mounted Blower Motor
B
]
A. Down vent
NOTE: For island locations, a front- or rear-mounted blower
motor can also be mounted for right or left venting if needed for
your application. Most island applications would still require the
venting to be directed down through the floor.
Built-In Cabinet Locations
S
B
II II II .......
C
A. Down vent
B. Left vent
C. Right vent
K J
Rear Mounted Blower Motor
B
A _ D_
E
K d
A. Wall cap
B. 6" (15.2 cm) round metal vent
C. 16" (40.6 cm) maximum
D. 6" (15.2 cm) round PVC sewer pipe
E. 6" (15.2 cm) round metal vent transition with damper
(supplied)
F. 6" (15.2 cm) round PVC coupling
G. Concrete slab
H. 6" (15.2 cm) round PVC sewer pipe
I. 6" (15.2 cm) round 90 ° PVC sewer pipe elbow
J. Tightly pack gravel or sand completely around pipe.
K. 6" (15.2 cm) round 90° PVC sewer pipe elbow
L. 6" (15.2 cm) round PVC coupling
M. 12" (30.5 cm) minimum
Calculating Vent System Length
3W' x 10" (8.3 x 25.4 cm) rectangular vent is required from the
blower motor box. It can be transitioned to 6" (15.2 cm) round
vent if needed.
Maximum Length of Vent System
Vent Length
6" (15.2 cm) round 35 ft (8.9 m)
31/4"x 10" (8.3 cm x 25.4 cm) 35 ft (8.9 m)
8