Instructions / Assembly
Table Of Contents
- DRYER SAFETY
- Dryer Safety
- DRYER MAINTENANCE AND CARE
- Cleaning the Dryer Location
- Cleaning the Dryer Interior
- Removing Accumulated Lint
- Cleaning the Lint Screen
- Changing the Drum Light (on some models)
- Check Your Vent System for Good Airflow
- Maintain Good Airflow
- Nonuse, Storage, and Moving Care
- INSTALLATION REQUIREMENTS
- Tools and Parts
- Location Requirements
- Electrical Requirements – U.S.A.
- Electric Requirements – Canada
- INSTALLATION INSTRUCTIONS
- Install Leveling Legs
- Electrical Installation – U.S.A.
- Home Venting Requirements
- Plan Vent System
- Install Vent System
- Connect Inlet Hoses
- Connect Vent (Vented Models Only)
- Level Dryer
- Complete Installation Checklist
- SECURITE DE LA SECHEUSE
- Sécurité de la sécheuse
- ENTRETIEN ET REPARATION DE LA SECHEUSE
- Nettoyage de l’emplacement de la sécheuse
- Nettoyage de l’intérieur de la sécheuse
- Retrait de la charpie accumulée
- Nettoyage du filtre à charpie
- Changement de l’ampoule d’éclairage du tambour (sur certains modèles)
- Vérification d’une circulation d’air adéquate pour le système d’évacuation
- Pour maintenir une bonne circulation d’air
- Précautions à prendre avant une non-utilisation, un entreposage ou un déménagement
- EXIGENCES D'INSTALLATION
- Outils et pièces
- Exigences d’emplacement
- Spécifications électriques – É.-U.
- Spécifications électriques – Canada
- INSTRUCTIONS D'INSTALLATION
- Installation des pieds de réglage de l’aplomb
- Installation électrique – É.-U.
- Exigences concernant l’évacuation pour une maison
- Planification des circuits de conduits
- Installation du conduit d’évacuation
- Raccordement des tuyaux d’alimentation
- Raccordement du conduit d’évacuation (sur les modèles avec conduit seulement)
- Réglage de l’aplomb de la sécheuse
- Liste de vérification pour installation terminée
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
13
6. Connect remaining wires
Connect remaining wires under outer terminal block screws.
Tighten screws. Insert tab of terminal block cover into slot of
dryer rear panel. Secure cover with hold-down screw. Now,
go to “Venting Requirements.”
3-Wire Power Supply Connection
IMPORTANT: Use where local codes permit connecting cabinet-
ground conductor to neutral wire.
A. 3-wire receptacle
(NEMA type 10-30R)
B. 3-wire plug
C. Neutral prong
D. Spade terminals with
upturned ends
E. 3/4" (19 mm) UL-listed
strain relief
F. Ring terminals
G. Neutral (white or center
wire)
3. Remove center screw
Remove center terminal block screw (B).
4. Connect neutral wire
Connect neutral wire (white or center) (C) of power supply
cord under center terminal block screw (B). Tighten screw.
5. Connect remaining wires
Connect remaining wires under outer terminal block screws.
Tighten screws. Insert tab of terminal block cover into slot of
dryer rear panel. Secure cover with hold-down screw. Now,
go to “Venting Requirements.”
Direct Wire Connection
Direct wire strain relief
1. Attach direct wire strain relief
Unscrew the removable conduit connector (A) and any screws
from a 3/4" (19 mm) UL listed strain relief (UL marking on
strain relief). Put the threaded section of the strain relief
through the hole below the terminal block opening (B).
Reaching inside the terminal block opening, screw the
removable conduit connector (A) onto the strain relief threads
(C) and tighten securely.
2. Attach direct wire cable to strain relief
Put direct wire cable through the strain relief. The strain relief
should have a tight fit with the dryer cabinet and be in a
horizontal position. Tighten strain relief screw against the
direct wire cable.
For 4-wire Direct Wire Connection, continue to step 3.
4-wire direct wire connection: Go to
“4-Wire Direct Wire Connection.”
For 3-wire Direct Wire Connection, continue to step 3.
3-wire direct wire connection: Go to
“3-Wire Direct Wire Connection.”