Owners Manual
Table Of Contents
- Dryer Safety
- Dryer Safety
- Dryer Maintenance and Care
- Cleaning the Dryer Location
- Cleaning the Dryer Interior
- Removing Accumulated Lint
- Cleaning the Lint Screen
- Changing the Drum Light (on some models)
- Check Your Vent System for Good Airflow
- Maintain Good Airflow
- Nonuse, Storage, and Moving Care
- Special Instructions for Steam Models
- Installation Instructions
- Requirements
- Tools and Parts
- Location Requirements
- Electrical Requirements – U.S.A.
- Electric Requirements – Canada
- Installation
- Install Leveling Legs
- Electrical Installation – U.S.A.
- Venting Requirements
- Plan Vent System
- Install Vent System
- Connect Inlet Hoses
- Connect Vent (Vented Models Only)
- Level Dryer
- Complete Installation Checklist
- Sécurité de la sécheuse
- Sécurité de la sécheuse
- Entretien et réparation de la sécheuse
- Nettoyage de l’emplacement de la sécheuse
- Nettoyage de l’intérieur de la sécheuse
- Retrait de la charpie accumulée
- Nettoyage du filtre à charpie
- Changement de l’ampoule d’éclairage du tambour (sur certains modèles)
- Vérification d’une circulation d’air adéquate pour le système d’évacuation
- Pour maintenir une bonne circulation d’air
- Précautions à prendre lorsque l’appareil n’est pas utilisé, est entreposé ou déménagé
- Instructions spécifiques pour les modèles vapeur
- Instructions d’installation
- Spécifications
- Outils et pièces
- Exigences d’emplacement
- Spécifications électriques – É.-U.
- Spécifications électriques – Canada
- L’installation
- Installation des pieds de nivellement
- Installation Électrique - U.S.A
- Exigences concernant l'évacuation
- Planification des circuits de conduits
- Installation du conduit d’évacuation
- Raccordement des tuyaux d’alimentation
- Raccorder le conduit d’évacuation (sur les modèles avec conduit seulement)
- Réglage de l’aplomb de la sécheuse
- Liste de vérification pour installation terminée
14
5. Connect remaining wires
Connect remaining wires under outer terminal block screws.
Tighten screws. Insert tab of terminal block cover into slot of
dryer rear panel. Secure cover with hold-down screw. Now,
go to “Venting Requirements.”
Direct Wire Connection
Direct wire strain relief
1. Attach direct wire strain relief
Unscrew the removable conduit connector (A) and any
screws from a 3/4" (19 mm) UL-listed strain relief (UL marking
on strain relief). Put the threaded section of the strain relief
through the hole below the terminal block opening (B).
Reaching inside the terminal block opening, screw the
removable conduit connector (A) onto the strain relief threads
(C) and tighten securely.
2. Attach direct wire cable to strain relief
Put direct wire cable through the strain relief. The strain relief
should have a tight fit with the dryer cabinet and be in a
horizontal position. Tighten strain relief screw against the
direct wire cable.
For 4-wire Direct Wire Connection, continue to step 3.
4-wire direct wire connection: Go
to “4-Wire Direct Wire
Connection.”
For 3-wire Direct Wire Connection, continue to step 3.
3-wire direct wire connection: Go
to “3-Wire Direct Wire
Connection.”
4-Wire Direct Wire Connection
IMPORTANT: A 4-wire connection is required for mobile homes
and where local codes do not permit 3-wire connections.
3. Prepare your 4-wire cable for direct
connection
Direct wire cable must have 5 ft. (1.52 m) of extra length so
dryer may be moved if needed.
Strip 5" (127 mm) of outer covering from end of cable, leaving
bare ground wire at 5" (127 mm). Cut 1 1/2" (38 mm) from
remaining 3 wires. Strip insulation back 1" (25 mm). Shape
ends of wires into hooks.
4. Prepare to connect neutral ground wire and
neutral wire
Remove center terminal block screw (B). Remove neutral
ground wire (E) from green external ground conductor screw
(A).