Installation Instructions

10
Top/bottom freezer models (continued)
Refer to the side diagrams for the following steps.
1. (continued)
On 14 to 18 Cubic Foot Top Freezer and Bottom Freezer
Models
Locate the ll tube and the round foam gasket from the ice
maker kit (the gasket may already be installed on the ll
tube). If not already done, slide the gasket over the end of
the ll tube.
Insert the ll tube through the hole in the rear of the
refrigerator with the spout facing down, and secure it with
two 1⁄2" hex-head sheet-metal screws.
Refer to the side diagrams for the following steps. You will be
working inside the freezer compartment.
1. Slide the plastic ll tube extension
(See components table on page 5) over the end of the ll
tube as far as it will go
(see DETAIL A).
NOTE: The plastic ll tube extension is not required for
models with open-top ll tube.
2. Flat wiring cover: Install the wiring cover over the ll tube
with the wiring harness through the slot. Hook the tab in the
side of the wiring cover into the slot in the back cover of the
freezer, and secure the cover with the screw you removed
earlier
(see DETAIL B).
Spout
Fill tube
Foam
gasket
1
2" hex-head
sheet-metal
screws
Installing the ll tube/gasket (14 to 18 cubic foot
and Bottom Freezer models)
DETAIL A
fill tube
extension
(See components
table on page 5)
Fill
tube
Wiring
harness
Installing the ll tube extension
DETAIL B
Route harness
through slot and fill
tube through hole
Hex scre
w
Ta
b
Mounting
hole
Edge of
cover
Route harness through slot and ll tube
through hole