Installation Guide

Installation Procedure:
1. Install Flange and Water Supply Valve
1. Install the water supply valve onto the installation
position according to the dimensions of the product.
2. Align the ange with the drainage outlet
3. Mark the installation positions for screws and drill holes
4. Fix the ange onto the oor
3. Install T# Screw, Mounting Screw
and Connect Pipe
1. Drill holes onto installation position and insert
expandable plastics
2. Make the bottom of connecting pipe face upward, then
cover the ange onto the water outlet tightly. Make sure
the pipe is not plugged.
3. Get two T# screws through the installation holes of the
connecting pipe. Adjust the screws to get the four holes
on the back side of the connecting pipe aligned with the
expandable plastics on the oor. Fix the connecting pipe
and 7# plastic onto the oor as illustrated
2. Mark Installation Holes
1. Mark the center line for the drainage outlet
2. Mark the installation position for the mounting
screws and connecting pipe as illustrated below
(drawing for distance between installation holes)
4. Install Toilet
1. Pick up the toilet and make sure the two pieces of
mounting screws are fully through the installing
holes of the toilet
2. Align the center of the toilet with the center line on
the oor and then gently place toilet down
Note: Make sure pipe has gone through the four layers
of sealing rubber spacer of the connecting pipe after
installing the toilet. If it is not fully through, it will have
a bad effect for ushing function
4. (con’t) Install Toilet
3. Place the toilet on the oor with screws and plastic
covers, then cover the decoration caps
6. Check Water Rell Pipe
1. Open the cistern cover and make sure the overow
pipe is inserted into the water relling pipe
Note: If the water relling pipe does not insert into the
overow pipe, the ushing water will be inadequate
5. Connect Water Supply and Check
Sealing Performance
1. Get the water supply valve and the water inlet with
supply connecting pipe (if the tting is separated
from the lter, connect the lter rst)
2. Turn on the water supply valve and make sure there
is no leakage on any joint. Fastening the nuts can
prevent leakage.
7. Install Toilet Seat
1. Install the toilet seat according to the installation
instruction then coat with a layer of silicone between
the toilet and oor
Note: Do not use the product immediately after completion
of installation. Make sure there is no water around
the product for 24 hours.
2”
Center Line
7⅛”
1⅜” - 2⅜”
Finished Wall
Center Line
Installing Hole for Expandable Plastic 1: 4 Pcs
ǿ 5, height of 1⅛”
Installing Hole for Expandable Plastic 2: 2 Pcs
ǿ 10, height of 2”
3309-EB
3222-EB
3351-EB
L=6¼” M= 7½”
L=6¼” M= 7”
L= 5⅛” M= 8⅝”
Expandable Plastic
Expandable Plastic 2