Installation Guide
NOTE
ASolarEdgeinvertermaybeinstalledinasitewithagenerator,howevermustnotoperateat
thesametimeasthegenerator.
Operatinganinverterandageneratorsimultaneouslywillvoidthewarranty.SolarEdgerequires
installingaphysicalorelectronicinterlock,whichwillpreventthegeneratorandinverterfrom
operatingsimultaneously.Interlockprocurement,installation,maintenanceandsupportare
theresponsibilityoftheinstaller.Damagetotheinverterduetoincorrectinterlockinstallation
oruseofaninterlockthatisincompatiblewiththeSolarEdgesystemwillrendertheSolarEdge
warrantyinvalid.
IMPORTANT SAFETY INFORMATION
To perform Rapid Shutdown, shut down AC power to the inverter. This can be done by turning off the
AC breaker in the main service panel, which is an approved AC disconnect as described in the NEC.
IMPORTANTSAFETYINSTRUCTIONS